The saga continues, with appeals and counter appeals.
This proposal is for a total capacity of 2GW. Consisting of two electrically independent circuits each of 1GW capacity.
I am surprised by the degree of controversy that this project has produced.
latest report here. https://www.bbc.co.uk/news/uk-politics-64388577
Aquind, proposed Anglo french inter-connector.
- adam2
- Site Admin
- Posts: 10895
- Joined: 02 Jul 2007, 17:49
- Location: North Somerset, twinned with Atlantis
Aquind, proposed Anglo french inter-connector.
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"
-
- Site Admin
- Posts: 14290
- Joined: 20 Sep 2006, 02:35
- Location: Newbury, Berkshire
- Contact:
Re: Aquind, proposed Anglo french inter-connector.
The problem is that they want to dig up a densely populated area to lay their cable. I would have thought that it would be cheaper and easier to keep the cable underwater for a bit longer and take it through Langstone Harbour to the east of Portsea Island. Taking it through Portsmouth Harbour is a no go as it would obstruct the entrance to one of the Royal Navy's largest bases and a cross channel port for a few weeks.
Action is the antidote to despair - Joan Baez