Took the plunge innit

Is Solar Power going to give the UK the energy it needs for the 21st century?

Moderator: Peak Moderation

User avatar
RenewableCandy
Posts: 12777
Joined: 12 Sep 2007, 12:13
Location: York

Took the plunge innit

Post by RenewableCandy »

An historic day here at Chateau Renewable. The gentlemen came round this morning and did the final measurements on the roof, and I wrote a rather large cheque for the deposit...yes, after all these years, Chateau Renewable is finally Going Solar!
Soyez réaliste. Demandez l'impossible.
Stories
The Price of Time
User avatar
biffvernon
Posts: 18538
Joined: 24 Nov 2005, 11:09
Location: Lincolnshire
Contact:

Post by biffvernon »

We'll be expecting photos.
(Maybe not of the gentleman.)
User avatar
JohnB
Posts: 6456
Joined: 22 May 2006, 17:42
Location: Beautiful sunny West Wales!

Re: Took the plunge innit

Post by JohnB »

RenewableCandy wrote:An historic day here at Chateau Renewable. The gentlemen came round this morning and did the final measurements on the roof, and I wrote a rather large cheque for the deposit...yes, after all these years, Chateau Renewable is finally Going Solar!
Are you sure you'll get an inverter with it, or will you just have a shiny roof for months until they can make one :D.
John

Eco-Hamlets UK - Small sustainable neighbourhoods
User avatar
RenewableCandy
Posts: 12777
Joined: 12 Sep 2007, 12:13
Location: York

Post by RenewableCandy »

The chaps said it's all gone a bit mental since FiTs came in: all the MICE (newly retired "Money Is Coming Easy"-types) are buying, and "you can't get inverters for love nor money".

I can wait. After all it's taken 3 years already.
Soyez réaliste. Demandez l'impossible.
Stories
The Price of Time
User avatar
Kentucky Fried Panda
Posts: 1743
Joined: 06 Apr 2007, 13:50
Location: NW Engerland

Post by Kentucky Fried Panda »

Are you having solar hot water (SHW) ?

I'm just gonna wait for TEOTWAWKI and then go rob all the solar speed signs.
User avatar
RenewableCandy
Posts: 12777
Joined: 12 Sep 2007, 12:13
Location: York

Post by RenewableCandy »

Sadly we can't have a SHW without re-arranging our entire heating system, as we haven't got a tank. Perhaps we should get one: come TEOTWAWKI a Tank'd be jolly useful :) !
Soyez réaliste. Demandez l'impossible.
Stories
The Price of Time
User avatar
JohnB
Posts: 6456
Joined: 22 May 2006, 17:42
Location: Beautiful sunny West Wales!

Post by JohnB »

RenewableCandy wrote:come TEOTWAWKI a Tank'd be jolly useful :) !
I'm sure it would be, but have you got anywhere to park it?
Image :lol:
John

Eco-Hamlets UK - Small sustainable neighbourhoods
User avatar
adam2
Site Admin
Posts: 10909
Joined: 02 Jul 2007, 17:49
Location: North Somerset, twinned with Atlantis

Post by adam2 »

I presume that this is a grid tied PV system ?

If so, I presume that you are aware that it wont provide any standby or backup power, you will still be just as grid reliant as before.

Still an excellent idea, for financial and enviromental reasons, but not a disaster prep.

You may wish to consider a small stand alone battery charging system as well. It could be worth fitting a single additional PV module for this at the same time.

In any long term emergency, the modules of your grid tied system could of course be used for battery charging.
To facilitate this, as many connections as posible should be accesable from inside the loft space, without requiring acces to the roof externaly.
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"
User avatar
RenewableCandy
Posts: 12777
Joined: 12 Sep 2007, 12:13
Location: York

Post by RenewableCandy »

Thanks for the reminder (about the connections). Yes it is a bog-standard grid-tied system, a topic about which I have thought long and hard and drawn, for what they're worth, the following conclusions:

1. The system will shut down in the event of a power cut (G83 and all that)
2. Power cuts (going on my own past experience) are far more likely to happen when it's cold
3. Coldness is far more likely to happen during the hours of darkness...
4. ...during which our roof would not be producing owt anyway
5. Some places are more succeptible to power outages than others: rural Cumbria and W. Wales for example
6...because they don't have the UK's biggest s*d-off power station (Drax) just 15 miles down the road (erm and Eggboro' and Ferrybridge)
7. The people who run Drax are having Biomass burners installed, and want one unit of the 6(?) to run on bio entirely...
8...with a view to carrying on after 2016 and the LCPD
9. HMG may very well decide that the EU can shove its LCPD where the sun don't shine rather than leave most of Yorkshire in the dark
10. We could have a battery that's topped up from the bog-standard mains or, if the worst comes to the worst, I can shin out of the Velux and wire one of the panels up individually (although I would of course have to do this at night!)
11. I am also wondering if there's such a thing as a low energy mains-emulator that can be fed into the inverter to deceive it into thinking that mains is still on?

If any of this is bollix, I'm all ears...
Soyez réaliste. Demandez l'impossible.
Stories
The Price of Time
User avatar
adam2
Site Admin
Posts: 10909
Joined: 02 Jul 2007, 17:49
Location: North Somerset, twinned with Atlantis

Post by adam2 »

I am not aware of any easy way to fool a grid tie inverter into "thinking" that is connected to the grid when it is not.

As you point out, grid tie PV has many advantages, but has the drawback of not providing any protection against power cuts.

Power cuts are indeed more likely in winter weather, when PV provides little, and at night when PV provides nothing.
There are 3 main causes of power cuts.

1) mechanical failure or breakdowns in the network, this can happen at any time, without notice, but is more likely in severe weather due to the liklehood of storm damage.

2) industrial disputes over wages etc. In theory these can occur at any time, but in practice are likely to be timed for winter weather for maximum impact.

3) Rota cuts due to lack of generating capacity. Most likely at times of peak load, but can occur at any time.

I dont think that the proximity of a large power station will help you at all.
Any lack of generating capacity would lead to rota power cuts imposed as fairly as possible over the whole of the UK. I donth think that district near large power plants would get special treatment..

Industrial disputes would lead either to rota cuts as above, or to localised random breakdowns taking longer to repair.
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"
User avatar
RenewableCandy
Posts: 12777
Joined: 12 Sep 2007, 12:13
Location: York

Post by RenewableCandy »

Phone call from the PV Man today and we have a date!! So, by sunset on 4th August, Chateau Renewable will be Solar! (I checked and yes, they do have a shedload of inverters...s'long as nobody hijacks the shed :) )
Soyez réaliste. Demandez l'impossible.
Stories
The Price of Time
User avatar
JohnB
Posts: 6456
Joined: 22 May 2006, 17:42
Location: Beautiful sunny West Wales!

Post by JohnB »

RenewableCandy wrote:Phone call from the PV Man today and we have a date!! So, by sunset on 4th August, Chateau Renewable will be Solar! (I checked and yes, they do have a shedload of inverters...s'long as nobody hijacks the shed :) )
So summer ends on 3rd August then :cry:
John

Eco-Hamlets UK - Small sustainable neighbourhoods
User avatar
emordnilap
Posts: 14814
Joined: 05 Sep 2007, 16:36
Location: here

Post by emordnilap »

Good on yer, RC.
I experience pleasure and pains, and pursue goals in service of them, so I cannot reasonably deny the right of other sentient agents to do the same - Steven Pinker
User avatar
RenewableCandy
Posts: 12777
Joined: 12 Sep 2007, 12:13
Location: York

Post by RenewableCandy »

Believe it or not I am beginning to get a bit nervous. I keep wondering if they'll find something non-part-pee our electrics, or that the bank won't be able to process the payment (which has to go through on the day and which has to come from 2 different accounts because we're skint til next month), or that the electric company won't agree we're fit for FiTs, or if the drive/path/garden/attic is too full of stuff for them to go about their business safely (we'e had a massive tidy-up and Chateau Renewable, especially the attic, now looks slightly unfamiliar). Apparently the project includes (it says in the blurb) a "risk assessment". I'd like to see what a risk assessment of Chateau Renewable looks like (then again perhaps I wouldn't...)

Anyone else ever felt owt like this?

The worst thing of all is that I'm already contemplating the next big project (in purely absract terms, you understand...)
Soyez réaliste. Demandez l'impossible.
Stories
The Price of Time
User avatar
RenewableCandy
Posts: 12777
Joined: 12 Sep 2007, 12:13
Location: York

Post by RenewableCandy »

Pictures (for those who like that sort o'thing...)

The van arrives...

Image

reinforcements turn up

Image

Scaffolding for ascending the South Face of Chateau Renewable...

Image

Panels arrive!

Image

Frames go into place...

Image

...without having to remove the tiles

Image

a panel waits for a lift...

Image

...and pauses on its way up

Image

Panels are bolted to the frame (in the rain!)

Image

Will get a shot of the roof and the internal gubbins when it's all done: the electrician finishes tomorrow!
Soyez réaliste. Demandez l'impossible.
Stories
The Price of Time
Post Reply