Plans for world's first tidal power plant
Moderator: Peak Moderation
- adam2
- Site Admin
- Posts: 11013
- Joined: 02 Jul 2007, 17:49
- Location: North Somerset, twinned with Atlantis
I am reasonably hopeful that a tidal lagoon if built will actually produce the claimed power with reasonable reliability.
If instead the money was spent on nuclear, then I am less hopeful that the power will actually be produced.
If instead the money was spent on nuclear, then I am less hopeful that the power will actually be produced.
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"
- adam2
- Site Admin
- Posts: 11013
- Joined: 02 Jul 2007, 17:49
- Location: North Somerset, twinned with Atlantis
"tidal lagoon project thrown out"
Regrettably in my view. https://www.bbc.co.uk/news/uk-wales-sou ... s-44589083
Regrettably in my view. https://www.bbc.co.uk/news/uk-wales-sou ... s-44589083
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"
It's a complicated situation. It is really expensive. Cutting demand or building new generating capacity with off-shore wind would be a lot cheaper low-carbon solutions. But one thing that makes us more cost sensitive than perhaps we should be is the way the subsidy is paid through our bills. This is a horribly regressive way to pay for things, and creates understandable backlash.
Personally, as a chartered engineer living nearby, I would have liked to see the project go ahead, but I can understand why it probably wasn't a good idea.
Personally, as a chartered engineer living nearby, I would have liked to see the project go ahead, but I can understand why it probably wasn't a good idea.
-
- Posts: 4124
- Joined: 06 Apr 2009, 22:45
- BritDownUnder
- Posts: 2586
- Joined: 21 Sep 2011, 12:02
- Location: Hunter Valley, NSW, Australia
It would have been a nice test project into tidal power in my opinion. Better to see the money spent in the UK rather than squandered overseas (or on an Olympic bid or World Cup bid) or even on Russian or Qatari gas.
I sympathize with the people of Wales on this lost opportunity to develop low carbon electricity generation.
On the negative side it seems that the length of wall compared with the lagoon area enclosed does not make good use of natural features such as coastlines and islands and hence the (I think) 9km wall/barrier and I guess about 1km of natural coastline meant that the construction cost would have been higher.
I am aware of the differences between a tidal lagoon and a tidal barrage across an estuary and think that a project such as that proposed somewhere in Lancashire across a small estuary would have been more cost effective. Combined with flood defence such as across the Wash to protect the highly valuable agricultural land of the Fens against man made global warming induced sea level rise I think there is merit in large scale barrages before the country becomes too bankrupt to pay for them.
I do appreciate, Mr Woodburner, that a barrage is probably more damaging to non-human life, as is indeed most human 'development' but that is not a good enough excuse for me anyway to stop the development of low-carbon electricity.
I can only think that the government stood back and baulked at the cost of a 'test' project.
On an unrelated note I have been try to become a chartered engineer in Australia for a while now but it is a bit of an old boys club over here and recent changes have made this even more so. Basically you need a chartered engineer in your organisation to sponsor your development.
I sympathize with the people of Wales on this lost opportunity to develop low carbon electricity generation.
On the negative side it seems that the length of wall compared with the lagoon area enclosed does not make good use of natural features such as coastlines and islands and hence the (I think) 9km wall/barrier and I guess about 1km of natural coastline meant that the construction cost would have been higher.
I am aware of the differences between a tidal lagoon and a tidal barrage across an estuary and think that a project such as that proposed somewhere in Lancashire across a small estuary would have been more cost effective. Combined with flood defence such as across the Wash to protect the highly valuable agricultural land of the Fens against man made global warming induced sea level rise I think there is merit in large scale barrages before the country becomes too bankrupt to pay for them.
I do appreciate, Mr Woodburner, that a barrage is probably more damaging to non-human life, as is indeed most human 'development' but that is not a good enough excuse for me anyway to stop the development of low-carbon electricity.
I can only think that the government stood back and baulked at the cost of a 'test' project.
On an unrelated note I have been try to become a chartered engineer in Australia for a while now but it is a bit of an old boys club over here and recent changes have made this even more so. Basically you need a chartered engineer in your organisation to sponsor your development.
G'Day cobber!
- adam2
- Site Admin
- Posts: 11013
- Joined: 02 Jul 2007, 17:49
- Location: North Somerset, twinned with Atlantis
Cutting demand might indeed be cheaper, but I see no suggestion that any of the money saved by not building the tidal lagoon is instead to be spent on demand reduction.clv101 wrote:It's a complicated situation. It is really expensive. Cutting demand or building new generating capacity with off-shore wind would be a lot cheaper low-carbon solutions. But one thing that makes us more cost sensitive than perhaps we should be is the way the subsidy is paid through our bills. This is a horribly regressive way to pay for things, and creates understandable backlash.
Personally, as a chartered engineer living nearby, I would have liked to see the project go ahead, but I can understand why it probably wasn't a good idea.
Wind power is getting cheaper, and in IMO, we need more of it. Not however the complete answer as the wind does not blow all the time.
Tidal power by contrast can be accurately predicted, and can also be modulated according to demand, at least to an extent.
I suspect that without this project, that our already unwise reliance on imported natural gas will increase.
Elsewhere on these forums, the inadequacy of our natural gas storage is discussed. Neither private capital nor HMG seem keen to build more storage, since in strictly cash terms it is unlikely to make a profit.
As a result we are increasingly vulnerable to any supply problems.
It could IMHO, reasonably be argued that building more renewable generating capacity SHOULD be subsidised on energy security grounds and by reducing the need for more natural gas storage.
Consider as an example, the building of another 2GW of wind turbines.
2GW would not be produced continually of course, but taking "winter" as being 2,500 hours, one might expect in the region of 1000GWH of electricity to be produced.
That would save about 2,500 GWH of natural gas.
With winter natural gas stocks at very roughly 25,000GWH, the building of an additional 2GW of renewable generating capacity, has in effect also increased gas storage by 10%
2GW of tidal power would be of even greater benefit, since the capacity factor would be better.
Power would of course be produced, and natural gas be saved all year round, but winter is of greater concern.
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"
However, the Wyre Estuary tidal energy project still seems to be in the running....
Energy boss calls alternative scheme a 'golden opportunity' after government turns down Swansea tidal lagoon:
https://www.imeche.org/news/news-articl ... dal-lagoon
Energy boss calls alternative scheme a 'golden opportunity' after government turns down Swansea tidal lagoon:
https://www.imeche.org/news/news-articl ... dal-lagoon
- BritDownUnder
- Posts: 2586
- Joined: 21 Sep 2011, 12:02
- Location: Hunter Valley, NSW, Australia
That Wyre estuary project must have been the one I was thinking about. I would like to see larger schemes developed in the Humber, Wash and Thames estuaries and promoted as much as for flood defence and energy storage as for tidal energy roles. they could also make useful bridges in the case of the Thames and Humber anyway. This smaller scheme could be used as a test bed for similar larger schemes. I guess they could use the experience based on the 40 year old La Rance scheme in France but I guess UK civil servants don't speak French anymore.
Interesting that the only commenter on the article you posted was none other than the 'world famous in New Zealand' Bryan Leyland who is a New Zealand based Electrical Engineer with well known views on many things electrical. Google him if you are interested. I went to one of his lectures on Electrical Energy futures for New Zealand many years ago which degenerated into a farce about historic CO2 levels based on readings taken from Egyptian tombs.
Interesting that the only commenter on the article you posted was none other than the 'world famous in New Zealand' Bryan Leyland who is a New Zealand based Electrical Engineer with well known views on many things electrical. Google him if you are interested. I went to one of his lectures on Electrical Energy futures for New Zealand many years ago which degenerated into a farce about historic CO2 levels based on readings taken from Egyptian tombs.
G'Day cobber!
-
- Site Admin
- Posts: 14287
- Joined: 20 Sep 2006, 02:35
- Location: Newbury, Berkshire
- Contact:
Anything in the Bristol Channel/Severn Estuary should be a good bet as this area has the biggest tidal difference in the UK. Perhaps the conventional energy companies behind the government's decision to drop Swansea Bay were conscious of this and so wanted another, less good, proposal to go ahead first and not be quite so much of a success, making it easier to stop any more encroachment on their profits.
Action is the antidote to despair - Joan Baez
- BritDownUnder
- Posts: 2586
- Joined: 21 Sep 2011, 12:02
- Location: Hunter Valley, NSW, Australia
Looking at the numbers it looks like the Bristol Channel has a tidal range maximum of 15 metres and the Wyre has 8.2 metres maximum.kenneal - lagger wrote:Anything in the Bristol Channel/Severn Estuary should be a good bet as this area has the biggest tidal difference in the UK. Perhaps the conventional energy companies behind the government's decision to drop Swansea Bay were conscious of this and so wanted another, less good, proposal to go ahead first and not be quite so much of a success, making it easier to stop any more encroachment on their profits.
The problem with the Severn is that while it is the best resource in the UK it also the biggest by far and will be the most costly. I would be happy for the Wyre to be used as a testbed and I think you will get far more MWh per unit civil construction cost from a barrage than you will from a lagoon because the 'walls' are much shorter.
Think big! Start small!
G'Day cobber!
-
- Posts: 4124
- Joined: 06 Apr 2009, 22:45
With frequently voiced ecological and environmental concerns, how do you square that with the wish to have a project which will destroy a major habitat?kenneal - lagger wrote:Anything in the Bristol Channel/Severn Estuary should be a good bet as this area has the biggest tidal difference in the UK. Perhaps the conventional energy companies behind the government's decision to drop Swansea Bay were conscious of this and so wanted another, less good, proposal to go ahead first and not be quite so much of a success, making it easier to stop any more encroachment on their profits.
- adam2
- Site Admin
- Posts: 11013
- Joined: 02 Jul 2007, 17:49
- Location: North Somerset, twinned with Atlantis
In my view, the loss of wildlife habitat though regrettable is acceptable.
No means of producing electricity is completely benign, but renewables such as tidal power, wind, solar, and hydroelectric power, are in my view far preferable to the continued growth in fossil fuel burning.
Without much wider use of renewables, most wildlife habitats are doomed in any case due to rising temperatures, more energetic storms, and increasing sea levels.
It should be remembered that fossil fuel power plants not only add to carbon emissions by the continual fuel burning, but also result in a lot of carbon emissions during construction including the production of the materials used.
Tidal power involves a lot of construction materials, but once built it involves no significant ongoing carbon emissions.
Remember also that imported fossil fuels have an even worse environmental impact than similar UK produced fuels, due to the fuel used in building and operating transport facilities and the increased opportunities for leaks and losses.
No means of producing electricity is completely benign, but renewables such as tidal power, wind, solar, and hydroelectric power, are in my view far preferable to the continued growth in fossil fuel burning.
Without much wider use of renewables, most wildlife habitats are doomed in any case due to rising temperatures, more energetic storms, and increasing sea levels.
It should be remembered that fossil fuel power plants not only add to carbon emissions by the continual fuel burning, but also result in a lot of carbon emissions during construction including the production of the materials used.
Tidal power involves a lot of construction materials, but once built it involves no significant ongoing carbon emissions.
Remember also that imported fossil fuels have an even worse environmental impact than similar UK produced fuels, due to the fuel used in building and operating transport facilities and the increased opportunities for leaks and losses.
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"
-
- Posts: 4124
- Joined: 06 Apr 2009, 22:45
Well we will disagree then. My view is that habitat loss is not acceptable, neither is increased use of fossil fuels to provide power for what is effectively an out of control human population. There has been decline of MANY species over the last few decades involving loss of 90% and greater. How much more loss are you going to find acceptable before you wake up and say we’ve got to change direction?adam2 wrote:In my view, the loss of wildlife habitat though regrettable is acceptable.
No means of producing electricity is completely benign, but renewables such as tidal power, wind, solar, and hydroelectric power, are in my view far preferable to the continued growth in fossil fuel burning.
Without much wider use of renewables, most wildlife habitats are doomed in any case due to rising temperatures, more energetic storms, and increasing sea levels.
It should be remembered that fossil fuel power plants not only add to carbon emissions by the continual fuel burning, but also result in a lot of carbon emissions during construction including the production of the materials used.
Tidal power involves a lot of construction materials, but once built it involves no significant ongoing carbon emissions.
Remember also that imported fossil fuels have an even worse environmental impact than similar UK produced fuels, due to the fuel used in building and operating transport facilities and the increased opportunities for leaks and losses.
Last edited by woodburner on 09 Aug 2018, 17:48, edited 2 times in total.
- adam2
- Site Admin
- Posts: 11013
- Joined: 02 Jul 2007, 17:49
- Location: North Somerset, twinned with Atlantis
I think that we need to change direction TOWARDS more renewables and AWAY from fossil fuels.
I also consider that we need to reduce total energy use, and I do what I can by not flying or driving, for example.
I also believe that humans are too numerous, and at least I have not added to the problem as I have no kids.
I also consider that we need to reduce total energy use, and I do what I can by not flying or driving, for example.
I also believe that humans are too numerous, and at least I have not added to the problem as I have no kids.
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"
Re: Plans for world's first tidal power plant
Tidal lagoon plans revived by Welsh Government:
https://www.constructionnews.co.uk/civi ... 5-03-2021/?
https://www.constructionnews.co.uk/civi ... 5-03-2021/?
The Welsh Government is exploring options to revive plans for a tidal lagoon energy project. It has advertised a market engagement exercise to understand the appetite among financiers, developers and contractors to work on a future project. Billed as the Welsh Tidal Lagoon Challenge, the government is exploring the nature and value of any potential support it would have to provide to make such a scheme viable.
The new lagoon challenge comes two-and-a-half years after the government in Westminster pulled its support for a proposed tidal lagoon project in Swansea bay (pictured). Then energy secretary Greg Clark said in June 2018 that the £1.3bn scheme, as well as other proposed tidal lagoon projects, would not provide value for money. That same month it was reported that the Welsh Government had offered to invest £200m in the scheme to get it built. Four months later a local authority taskforce concluded that development of a tidal energy scheme needed to be led by the private sector without reliance on public sector subsidies. Planning for the Swansea scheme, which was initially granted in 2015, expired in July last year. However, developer Tidal Power Plc insisted that because it had carried out some work on the site that the development consent order had not lapsed.