The Independent - 20/05/12
The Prime Minister is to be briefed on plans for a £30bn, 10-mile tidal barrage from Somerset to South Wales which could provide 5 per cent of Britain's total electricity.
David Cameron signalled his backing, telling MPs: "A huge amount of renewable energy could be delivered through a barrage of this kind."
Article continues ...
Cameron to view revived Severn barrage plan
Moderator: Peak Moderation
Cameron to view revived Severn barrage plan
- adam2
- Site Admin
- Posts: 11013
- Joined: 02 Jul 2007, 17:49
- Location: North Somerset, twinned with Atlantis
Was not this idea out nimbied last time it was proposed ?
Why should it be different this time.
I doubt that it will be built, though no doubt a billion or two could be spent on studies, assements, consulations, and nimbyfests, probably the conclusion will be reached that more research is needed.
Why should it be different this time.
I doubt that it will be built, though no doubt a billion or two could be spent on studies, assements, consulations, and nimbyfests, probably the conclusion will be reached that more research is needed.
"Installers and owners of emergency diesels must assume that they will have to run for a week or more"